Publication
Impact of Collector Network Aggregation of Solar and Type 4 Wind Farms for Short Circuit Studies
Abstract
With increasing interest in renewable energy generation, grid integration of Distributed Energy Resources (DERs), such as solar photovoltaic (PV) plants, wind turbine farms, and energy storage systems have become more common. These connected DERs usually consist of inverters, pad-mounted transformers, and collector feeders. As the size and number of PV plants and wind farm increases, it becomes challenging for power system planners to study their impact on the power system, since it is not practical to represent all individual inverters, transformers and feeders to conduct simulations. This paper examines the impact of aggregating the collector network in a solar farm and a type-4 wind farm, employing two aggregation techniques. The first represents the collector network with an equivalent impedance and a shunt capacitance, while the second assumes that the impact of the collector is negligible.
AI Summary
This paper studies how much detail is actually needed when modeling the collector networks of large solar PV and Type 4 wind farms for short-circuit studies. Using a detailed electromagnetic-transient model of a real 150 MW solar farm, the authors compare the complete collector system with simplified models that either replace the collector network with an equivalent representation or neglect its impedance altogether. For the tested three-phase, line-to-line, and single-line-to-ground faults, the collector network has little influence because the inverter-filter and pad-mounted-transformer impedances dominate; a lumped farm model reproduces the detailed model with errors below about 2% in the reported fault cases. A sensitivity study shows that error increases as collector feeders become much longer, but remains small for practical PV and Type 4 wind-farm layouts. The simplification also reduces computational burden dramatically, with a reported five-second EMT simulation dropping from roughly 12 hours for the detailed farm to about 9 minutes for the lumped model, supporting the use of aggregated IBR-farm models for efficient short-circuit analysis.
Full Paper
The full paper is available from the publisher or an authoritative repository.
View Published Version ↗